As on 31st May, 2011 (Prov.)
State Owned Shared Projects (RVPN) Central Sector Projects
Others (IPP) Allocation From Unallocated quota
1 STATE OWNED Installed Capacity (MW) Raj. Share % Firm capacity available to Raj. (MW)
A RVUN
(a) HYDRO
1 MAHI(2x25+2x45) 140.00
100.00
140.00
2 ANOOPGARH(3x1.5+3x1.5)
9.00
100.00
9.00
3 MAHI-RMC(2x0.4+1x0.165)
0.97
100.00
0.97
4 SURATGARH MH (2x2)
4.00
100.00
4.00
5 MANGROL MH (3x2)
6.00
100.00
6.00
6 PUGAL MH (1x1.5+1x0.65)
2.15
100.00
2.15
7 CHARANWALA (1x1.2)
1.20
100.00
1.20
8 BIRSALPUR MH (1x0.535)
0.54
100.00
0.54
  SUB-TOTAL (a)
163.85
163.85
 
   
 
(b) THERMAL / GAS
1 KTPS STAGE.I,II,III (2x110+2x210+1x210)
850.00
100.00
850.00
 
2 KTPS STAGE.IV (1x195)
195.00
100.00
195.00
 
3 RAMGARH GAS (1x3)
3.00
100.00
3.00
 
4 RAMGARH GAS (1x35.5)
35.50
100.00
35.50
 
5 RAMGARH GAS EXTN. (2x37.5)
75.00
100.00
75.00
 
6 STPS STAGE-I,II,III
(2x250+2x250+1x250)
1250.00
100.00
1250.00
 
7 DHOLPUR GTPP UNIT-1to3(3x110)
330.00
100.00
330.00
 
8 GIRAL TPS STAGE-I UNIT-1&2(2x125)
250.00
100.00
250.00
 
9 STPS STAGE-IV, UNIT-1(1x250)
250.00
100.00
250.00
 
10 KTPS STAGE-V, UNIT-7(1x195)
195.00
100.00
195.00
 
11 CHHABRA TPS STAGE-I, UNIT-1(1x250)
250.00
100.00
250.00
 
12 CHHABRA TPS STAGE-I, UNIT-2(1x250)
250.00
100.00
250.00
 
  SUB-TOTAL (b)
3933.50
3933.50
 
  SUB-TOTAL A(a+b)
4097.35
4097.35
 
   
 
(B) Non-Conventional
(Wind,Biomass)
 
1 Wind Power
1566.195
100.00
1566.195
 
2 M/S KALPATARU POWER LTD.(BIOMASS)
15.800
100.00
15.800
 
3 M/S CHAMBAL POWER LTD.
(BIOMASS)
7.500
100.00
7.500
 
4 M/S AMRIT ENVIROMENTAL POWER
LTD. (BIOMASS)
8.000
100.00
8.000
 
5 M/S SANBHAV ENERGY LTD.
(BIOMASS)
20.000
100.00
20.000
 
6 M/S S.M. ENVIROMENTAL TECH. LTD. (BIOMASS)
8.000
100.00
8.000
 
7 M/s Trans Tech Green Power Pvt. Ltd. (Biomass)
12.000
100.00
12.000
 
8 M/s Satyam Power Pvt. Ltd. (Biomass)
10.000
100.00
10.000
 
9
M/s Realiance Industries Ltd.(Solar)
5.000
100.00

 

5.000

 
  SUB-TOTAL (B)
1652.495
1652.495
 
   
 
  TOTAL-1 (A+B)
5749.845
5749.845
 
   
 
2 SHARED PROJECTS (RVPN)
 
(A) HYDRO
 
(a) B.B.M.B. COMPLEX
 
1 Bhakra Left Bank(5x108)
540.00
15.22
82.18
 
2 Bhakra Right Bank (5x157)
785.00
15.22
119.48
 
3 Kotla
(1x29.25+1x24.2+1x24.2)
77.65
15.22
11.82
 
4 Ganguwal
(1x29.25+1x24.2+1x24.2)
77.65
15.22
11.82
 
5 Dehar (6x165)
990.00
20.00
198.00
 
6 Pong (6x66)
396.00
58.50
231.66
 
(b) CHAMBAL COMPLEX
 
1 Gandhi Sagar (5x23)
115.00
50.00
57.50
 
2 Rana Pratap Sagar (4x43)
172.00
50.00
86.00
 
3 Jawahar Sagar (3x33)
99.00
50.00
49.50
 
  SUB-TOTAL (A) (a+b)
3252.30
847.95
 
   
 
(B) THERMAL
 
  SATPURA (5x62.5)
312.50
40.00
125.00
 
  SUB-TOTAL (B)
312.50
125.00
 
   
 
  TOTAL-2 (A+B)
3564.80
972.95
 
 
 
3 CENTRAL SECTOR PROJECTS
Installed Capacity
(MW)
Raj. Share %
Available
capacity to
Raj.(MW)
 
  ALLOCATION
(A) HYDRO (NHPC/JVNL/THDC)
 
1 TANAKPUR(3x31.4)
94.20
11.53
10.861
 
2 SALAL STAGE-I&II (690)
690.00
2.95
20.355
 
3 CHAMERA -I (3x180)
540.00
19.60
105.840
 
4 URI (4x120)
480.00
8.96
43.008
 
5 CHAMERA -II (3x100)
300.00
9.67
29.010
 
6 NJPS (6x250) (SJVNL)
1500.00
7.47
112.000
 
7 DHAULI GANGA (4x70)
280.00
9.64
27.000
 
8 TEHRI STAGE-I(UNIT-I TO IV)(4X250) (THDC)
1000.00
7.50
75.000
 
9 DULHASTI HEP
(UNIT-I TO III)(3X130)
390.00
10.88
42.420
 
10 Sewa HEP Stage-II (Unit 1 to 3) (3x40 MW)
120.00
10.84
13.008
 
11 Koteshwar HEP (4x100 MW) (Unit-1)
100.00
8.36
8.360
 
   
 
  SUB-TOTAL (A)
5494.20
486.86
 
   
 
(B) THERMAL / GAS (NTPC)
 
1 SINGRAULI (5x200+2x500)
2000.00
15.00
300.00
 
2 RIHAND TPS STAGE-I (2x500)
1000.00
9.50
95.00
 
3 RIHAND TPS STAGE-II (2x500)
1000.00
10.00
100.00
 
4 ANTA GAS (3x88.71+1x153.2)
419.33
19.81
83.07
 
5 AURIYA GAS (4x111.19+2x109.3)
663.36
9.20
61.03
 
6 DADRI GAS (4x130.19+2x154.5)
829.76
9.28
77.00
 
7 UNCHAHAR TPS STAGE - I(2x210)
420.00
4.76
20.00
 
8 UNCHAHAR TPS STAGE - II(2x210)
420.00
9.05
38.00
 
9 UNCHAHAR TPS STAGE - III(1x210)
210.00
10.95
23.00
 
10 Kahalgaon Stage - II (3x500), Unit- 1 & 3 (3x500)
1500.00
4.87
73.00
 
11 Barsingsar TPS Stage-I, Unit-1 (1x125)
125.00
100.00
125.00
 
12 Barsingsar TPS Stage-I, Unit-2 (1x125)
125.00
100.00
125.00
 
13 E. R. (in lieu of Tala-6x170=1020 MW)
 
  (i) Farakka (0.69%)
1600
0.69
11.04
 
  (ii) Kahalgaon-I (3.04%)
840
3.04
25.54
 
  (iii) Kahalgaon-II (2.24%)
1500
2.24
33.60
 
  (iv) Majia (5.88%)
250
5.88
14.70
 
  SUB-TOTAL (B)
12902.45
1204.98
 
   
 
(C) NUCLEAR (NPC)
 
1 RAPP(1x100+1x200)
300.00
100.00
300.00
 
2 NAPS (2x220)
440.00
10.00
44.00
 
3 RAPP EXTN. (1x220) Unit-3
220.00
28.41
62.50
 
4 RAPP EXTN. (1x220) Unit-4
220.00
28.41
62.50
 
5 RAPP(1x220) Unit-5
220.00
19.94
43.87
 
6 RAPP (1x220) Unit-6
220.00
19.94
43.87
 
  SUB-TOTAL (C)
1620.00
556.74
 
   
 
  TOTAL- 3 (A+B+C)
20016.65
2248.58
 
   
 
4 PRIVATE SECTOR PROJECTS
 
1 M/s Raj West Power (Unit-1 & 2) (2x135 MW)
270.00
100
270.00
 
  TOTAL- 4
270.00
270.00
 
  GRAND TOTAL (1+2+3+4)
29601.30
9241.38
 
 
 
  Capacity added during Apr-11 to May-11 (Prov.)


Increase in Installed Capacity (MW) / Comm./Sync. Date


Raj. Share %


Available capacity to Raj. (MW)


 
1 Koteshwar HEP (4x100 MW) (Unit-1)
100 MW/1-4-11
8.36
8.360
 
2 Wind Power
44.8 MW/May-11
44.80
44.800
 
  TOTAL INCREASE
53.16
 
Ongoing Works | Financial Status | Power Position | Lines and Substations | Related Links | Legal Disclaimer |Chief Vigilance Officer |
All contents © copyright 2006-2007 Rajasthan Rajya Vidyut Prasarn Nigam Limited. All rights reserved.
Site Developed by HCL